Sample Descriptions of recent Projects in the GTA
-
1. Food Processing Plants
-
2. Packaging Plants
-
3. Paint Plants
-
4. Pharmaceutical Plants
-
5. Chemical / Petro Chemical Plants
-
6. Industrial Plants
-
7. Mixed Use Buildings
-
8. Productivity Improvement Project
Food Processing Plants
- Cooler & Shipping Dock Expansion – Construction Cost = $4 million
- Warehouse expansion – Construction Cost = $1.5 million
- Milk Bay & Shipping Dock Expansion
- Taco shell plant
- Crystals installation plant
Packaging Plants
- Plant Restructuring – Construction Cost = $15 million
- Roof Raising – 8,000 sq.ft.
- Printing Press Foundations
- Process / Piping / Oxidizer foundation and ducting
- Compressor / Chiller Mezzanine & Second Floor
- Tank Farm upgrade – Dyke containment for solvent tanks, pump stations, piping, electrical, pipe bridge and supports
- Press Foundations, Structural Steel, HVAC, Electrical Design – $1 million
- Baghouse Facility / Cyclone, Dumpster and Compactor
- Solvent Wash and Storage Facilities / Solvent Ink Dispensing Flammable Room
Paint Plants
- New Manufacturing and Filling Building, Drum Storage facility & Site Services – Construction Cost = $5 million
- Dispersion tank and electrical room buildings
- 10,000 sq.ft. structural mezzanine
- Control lab, New Offices & Lunch Rooms
- Truck Loading stations & Truck Scale
- Project management of construction
- Red Label Flammable Rooms & Class II/III Rooms
- Pre-Start Health and Safety Review, Alkyd Building, Tank Farm & Tank Room
- Fire Audit (OFC) for Alkyd Building and Tank Room
- Fire Audit (OFC) & Fire Code Compliance Equivalency for Red Label Flammable Room
Pharmaceutical Plants
- Complete Reconstruction of Pharmaceutical Plant. Construction Cost = $5.5 million
– re-design of buildings, docks, equipment foundations, tank foundations, tank farm, structural steel, electrical, P&ID’s, piping, mechanical, pipe racks, cooling tower, spray dryer, instrumentation, HVAC, plumbing and site services.
– Explosion proof building
– Procurement of all equipment; vessels, pumps, agitators….etc.
– Obtain permits and supervise construction
– Total cost of project – approximately $5.5 million - Oncology Facility (Construction Cost = $3 million)
- Press Room, Granulation Suite, Coater installation, Chiller Platform Structure - Solvent Dispensing and storage building / Explosion Proof building study / Flammable Storage Room
- New Building Expansion / Lab design / Offices / Second Floor addition – Construction Cost = $2 million
- Pre-Start Health and Safety Reviews
Chemical / Petro Chemical Plants
- Solvent Tank Farm extension and modification – design for tanks, foundations, dyke & piping
- Designs to meet Fire Codes, Ministry of Labour (MOL) and Ministry of Environment (MOE)
- New equipment structure / Structural analysis and reinforcement of existing supports
- Sludge filter project – Structural, mechanical, process, instrumentation & electrical design and construction supervision
- EPI Tank installation – Engineering tank, piping, foundation, instrumentation and electrical
Industrial Plants
- Tank Farm extension – Six (6) 130,000 Imp.gal. tanks – piping, mechanical, vessels, instrumentation & electrical – Construction Cost = $1.5 million
- New White Oil Tank Farm – Nine (9) SS tanks, loading / unloading station and drum loading station (conveyor system) – Construction Cost = $1.8 million
- Blend Tank Farm – Two (2) SS Tanks, dykes, piping, electrical, instrumentation – Construction Cost = $1.0 million
- White Oil and Petrolatum plants – Tanks, Piping, Dykes, Electrical, Instrumentation & Load cells – Construction Cost = $500,000.00
- Baghouse facility installation / Railway dock
- Plant piping modifications / HVAC / Sprinkler systems
- Drum loading stations / Truck loading stations
- Electrical / Power Distribution plans of the entire plant / Traffic Control system
- Plot plans and underground drawings of entire plant
Mixed Use Buildings
- Retail (Gr. Floor) / Commercial (2nd Floor) / Residential Building (3rd Floor)
- Full Engineering, Project Management & Construction of 6,000sq.ft. GFA building
- Architectural, Structural, HVAC, Plumbing, Electrical, Site Services
- Site Plan Approval – City of North York, Ontario
- Construction Cost = $1.5 million
to generate and implement cost reduction projects, improve customer service, enhance the performance and quality of operations, assist in development / implementation of Total Operations Productivity (TOP) action plan:
Chemical Plants – Productivity Improvement Project
Productivity Improvement Project
- Material Flow & Handling Study
- Study to improve the efficiency of Painting and H-testing of Gas cylinders
- Study to improve the efficiency of orders assembly and evaluation of the overall plan operation efficiency
- General Productivity Improvement including empty cylinder sorting, order forms and order processing
- Study estimating productivity standards for hydrotest, shotblast and cylinder repairs
- Redesign of filled cylinder stockroom for improvement of labor efficiency and productivity